Calculate Load Factor

Select the originator item from the Scan List pane to display the Calculate Load Factor tab automatically.

The load factor is the ratio of the number of actually used packets to the maximum number of packets which the EtherNet/IP unit can send/receive in one second by cyclic communication. Packets other than by cyclic communication or unnecessary received packets are not considered for calculating the load factor. Determines the check box for selecting whether to enable or disable the IGMP snoop function for HUB, and calculates load factors.

NOTE

Modified on: 2019-12-10Feedback on this pagePanasonic hotline