Before you can start the operation recording function, the configuration file with the operation recording settings has to be transferred to the PLC.
The following condition has to be met before you can transfer the operation recording configuration file to the PLC.
The operation recording configuration is linked to the project. Download the configuration file to the PLC together with the project data in which the configuration has been done.
The operation recording can only be downloaded if the operation recording is stopped in the PLC.
Transfer the operation recording configuration using one of the following methods.
Download the operation recording configuration file directly from Control FPWIN Pro7. This method will store the configuration in the PLC's ROM.
Transfer the operation recording configuration file with an SD card. Depending on the method you are using, the configuration will be stored in the PLC's ROM or RAM.